Overview
An independent commissioning authority
We represent the plant owner or EPC contractor and enforce systematic testing protocols. This protects equipment warranties, proves safety interlocks and gives a smooth transition to commercial operation.
Our team coordinates vendors, tracks punch lists and signs off each system before it is handed over.
- Objective, vendor-neutral testing
- Milestone-driven schedules
- Complete as-built handover

What's included
Scope of work
Planning
- Commissioning and startup manuals
- Safety execution plans
- Pre-commissioning schedules and test procedures
Testing
- Cold loop verification
- Hot loop live testing
- Instrument calibration validation
- Integrated performance testing at peak load
Coordination and handover
- Vendor coordination
- Punch-list management
- Interlock sequence sign-off
- Operator training and as-built documents